Case study

Location: New Street Square, London

Client: Landsec

Main contractor: Overbury

Contract value: £21 Million

Programme: 18 Months

Sqft: 82,000

Design: GMEP Design & Build

H&S Scoring: 94.32%

5 New Street Square

Brief

A mechanical & electrical commercial fit-out to enable an NZC trajectory for the minimisation of embodied carbon by the retention and refurbishment of the main building with a view to achieving a Zero Carbon Net.

Scope of services

  • Lighting, lighting control, upgrading existing
  • New CNS system including infrastructure
  • Updating EMS system, including metre replacement
  • Basebuild UPS system
  • Replacement of ACB (Air Circuit Breaker)
  • New LTHW heating system
  • New CTHW heating system
  • Mechanical supply & extract system
  • Public health installation.
  • BREEAM Excellent Rating
  • WELL Gold rating

Helpful Resources:

5NSS - Sustainability Presentation

Get in touch with Gloster MEP.

Call: 0207 089 6910
Email: enquiries@glostermep.co.uk