Case study
Location: London
Client: Coventry University
Main contractor: Parkeray
Consultant: ABS
Contract value: £400,000
Programme: 12 weeks
Coventry University – London Campus
Brief
A mechanical and electrical fit-out of lecture theatres, offices, and teaching rooms for Coventry University’s London campus.
Scope of service
- Full lighting control system.
- Fire alarm and intruder alarm.
- Disabled refuge.
- VESDA system.
Solution
A full lighting control installation was provided for the project, together with power requirements throughout. All installed and commissioned on a tight programme of floor-by-floor handover.
Get in touch with Gloster MEP.
Call: 0207 089 6910
Email: enquiries@glostermep.co.uk