Case Study

Southbank Central

Hermes

CAT A Fitout to two buildings

Brief

To provide a CAT A fit out to office space which serves 8 floors on the Podium building and 9 floors on the Tower building and serves new reception areas for both the Tower and Podium buildings.

We also installed new toilets to both buildings.

The buildings are being designed to achieve BREEAM Excellent Standard.

Gloster were employed as a design and build contractor.

Scope

Electrical, Mechanical and Plumbing infrastructure to CAT A office space and toilets.

Plumbing – New cold and drainage to new toilets serving both Tower and Podium buildings

Mechanical

New LHTH and chilled water services           feeding fan coil units

BMS system to control room temperature via F.C.Us and new LTHW plant room

New supply and extract system   serving office space to both buildings

New toilet extract system serving both buildings

Electrical

New office lighting

New office lighting control

New office general power

Power to supply fan coil units

Fire alarm to all floors

Disabled alarm call points in toilet areas

Disabled refuge

Security / door access

 

Location: London

Client: Overbury

Contract Value: £12.5 Million

Programme: 9 Months

All case studies