Mission Critical

Slough Data Centre

Confidential

Slough

To design and deliver a new data centre facility supporting a total of 2 No. 2000kW data centre pods and 2 No. 3000kW, with roof and ground floor external plant areas. Initially the project will comprised of the  detailed design of one building including the shell and one 3000kW pod. The 2000kW halls will be designed so that they could be upgraded to 3000kW subject to a total maximum IT load for the data centre of 10MW.  The minimum area of each of the halls will be 1000m2.

Location: Slough

Client: Confidential

Programme: 24 Month